;

2.11 Using a Band to Estimate Level: Just Right

Look at this one. About 5 data points fall within the band, and it’s evenly spaced between those that are above and those that are below it. Now, you’ll practice looking at graphs and choosing the level band that best represents the level of the data path. 

A bar graph displaying an estimate level of 2.9, indicating the band is too low.
A graph estimating the band level as "too high".
A bar graph estimating the level of a band, just right.
Post a comment
This section is for the civil and public discussion of the content of this page. We reserve the right to moderate and remove comments that are irrelevant, disrespectful, hateful, harassing, threatening, or spamlike. If you are experiencing a technical issue, please contact our helpdesk for assistance.

Leave a Comment