;

2.10 Using a Band to Estimate Level: Too High

So let’s move it up a little. Now the band is too high. Look at all those data points that are below the level band. 

A bar graph displaying an estimate level of 2.9, indicating the band is too low.
A graph estimating the band level as "too high".
Post a comment
This section is for the civil and public discussion of the content of this page. We reserve the right to moderate and remove comments that are irrelevant, disrespectful, hateful, harassing, threatening, or spamlike. If you are experiencing a technical issue, please contact our helpdesk for assistance.

Leave a Comment