;

2.7 Estimating Level When Data Are Variable

When you’re looking at data that are variable, it can be helpful to imagine a band that covers several of the data points in the phase to estimate the level. When the data are this variable, there will be many data points that do not fall within the band, so you want the band to have about half of the data points above it, and about half below it. 

A graph with a red line and a variable line.
Post a comment
This section is for the civil and public discussion of the content of this page. We reserve the right to moderate and remove comments that are irrelevant, disrespectful, hateful, harassing, threatening, or spamlike. If you are experiencing a technical issue, please contact our helpdesk for assistance.

Leave a Comment